The offices of NS Reizigers in the National Monument of the Roosendaal Railway station has been considerably renovated and reconstructed by Ruland Architecten. The original structure and monumental value have been reinstated and the new layout and modern technology have been fittingly integrated into the historic building. This enables a new and future use of a very striking railway station.
The Roosendaal railway station building was designed by master builder D.E.C. Knuttel and railway architect G.W. Heukelom, and was built between 1905 – 1097. In 1944, part of the building including the original entrance hall, was damaged beyond repair. The new additions, after a design by architect S. van Ravesteyn, were finished in 1949.
NS Reizigers, district Brabant Noord,, has its offices in the parts of the building designed by Van Ravensteyn and in the original station houses. Over the years, the interiors were renewed and adapted several times to adapt to the changing usage. Ruland Architecten was commissioned by NS Stations (owner of the buildings) and NS Reizigers (the tenant) to renovate and revitalise both the interior and exterior comprehensively.
An interesting part of the constructional design is that the original monumental character was largely restored by making visible what had been hidden for a long time. Original floor constructions and ceilings have been uncovered and restored. A historic colour study was commissioned to reinstate the original colour scheme. Original layout and structures have been made visible by removing later, detracting renovations.
In the attics, the wooden roof structures have been insulated enabling the realisation of very spacious and special office rooms of differing dimensions. The wooden roof and truss constructions have remained uncovered. The new layout has been designed so that the characteristics of the original building have been reinforced.
The new office layout has been done using glass walls and existing brick walls have been fitted with window and door openings to benefit transparency. In order to attain a maximum contrast between existing and new layout, these glass walls have been minimally detailed and constructed from steel profiles.
The required climate control installations and ducting have been installed visibly, fitting the original structure of the building. The new installation room was constructed in the attic of the low part of the building, requiring the construction of an mezzanine floor above the original ceiling level. Floor and ceilings have been suspended, to reduce noise levels in the offices below to a minimum.
The new steel staircase in the meeting room on the ground floor is completely free standing with two platforms. The staircase is mounted on a newly constructed concrete foundation, hidden under the existing floor and new floor finish.
The floor and wall finishes as well as the fixed furniture for the entrance hall and pantries have been designed by Ruland Architecten as well. Inside the building, the brickwork has been cleaned and any damage has been repaired. Gutters and roof cladding have been renewed. Window frames, windows and doors have as much as possible been restored to the original layout and the glass has been replaced with monument glass. The existing dormers have also been restored according to the original design. The entire exterior has been repainted in the original colours after a historic colour study.
By restoring the structure and original monumental value and integrating modern layout and technology in a fitting way, this project enables current and future use of a very distinctive rail-related piece of industrial heritage.
| Location | Roosendaal |
| Floor area | 1775 sq m gross floor area |
| Year | 2011 – 2012 |
| Status | Completed |
| Client | NS Stations, Utrecht (Building) |
| Client | NS Reizigers, Utrecht (Internal structures and fittings) |
| Architect | Ruland Architects, Amsterdam |
| Constructor | ABR Adviesbureau voor Bouwkonstrukties, Roosendaal |
| Installations adviser | Overdevest Adviseurs, Den Haag |
| Building physics adviser | Peutz & Associes bv, Zoetermeer |
| Construction cost adviser | Bouwkostenadviesburo Treur bv, Hillegom |
| Construction site management | Arcadis Nederland bv, Amersfoort |
| Contractor | de Bonth van Hulten, Nieuwkuijk |
| Installations | Synto Installatiebedrijf bv, Goes |
| Interior builder | Visker Interieurbouw, Terheijden |
| Photography | Jannes Linders, Rotterdam |
Interesting links
Here are some interesting links for you! Enjoy your stay :)Newsletter
Archive
- November 2025
- March 2025
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- May 2024
- March 2024
- December 2023
- November 2023
- September 2023
- July 2023
- June 2023
- March 2023
- January 2023
- December 2022
- November 2022
- September 2022
- July 2022
- February 2022
- December 2021
- November 2021
- October 2021
- September 2021
- July 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- December 2019
- November 2019
- October 2019
- September 2019
- June 2019
- May 2019
- April 2019
- March 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- August 2017
- June 2017
- May 2017
- April 2017
- February 2017
- January 2017
- December 2016
- October 2016
- September 2016
- August 2016
- June 2016
- May 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- June 2015
- May 2015
- April 2015
- March 2015
- January 2015
- December 2014
- November 2014
- September 2014
- August 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014